1 results
 Ministry of Environment Conservation and Meteorology

The report was commissioned at the end of May 2008 with delivery of the final product by end June 2008. As such, it has been
researched and written over a very compressed timeline. Considerable shortcomings and inconsistencies in data
needed to be tackled in this period, and so a rapid desk assessment approach was used with limited opportunity for peer review and feedback.

Available online|1 copy

Call Number: 333.72 PAC [EL]

Physical Description: 97 p.